Iran to stabilize the production of nuclear power electricity by 2029



“We hope to increase the size [electricity] Production by 2000 MW by the end of the seventh [five-year] Development plan [until March 2029] The country’s nuclear capacity increased from 1000 to 3000 megawatts, “the head of the Atomic Energy Organization in Iran (AEOI), Muhammad Islami, was martyred by the Mezzan News Agency.

AEOI president said that Iran has already strengthened the construction of two energy units at Bushehr Nuclear Energy Station and resumed the construction of Karen NPP.

The first unit of Bushehr NPP, which was built with Russian assistance, was linked to the National Energy Network in September 2011. The second phase of the factory will include two power units. The development of the Karen Nuclear Energy Station in Khuztan Province is also a major project directed to the long -term energy sustainability in Iran.

MP/

Leave a Reply

Your email address will not be published. Required fields are marked *